Snowmaking
Ductile iron pipes for artificial snow production
Transporting water to hard-to-reach areas with steep slopes and unstable terrain, with the aim to of supplying artificial snow cannons is not only possible but also an accessible and profitable reality.
From simple to extremely complex artificial snow projects our team has a solution. Construtec offers the most innovative experience, technique, and products on the market for high mountain water conduction.
Solutions for artificial snow production
Our extensive experience allows us to anticipate needs, offering optimal hydraulic solutions for each artificial snow project, committing to meeting the most demanding requirements and ensuring an impeccable long-term water supply.
The solutions proposed by our technical department are based on sustainable efficiency. We firmly believe that responsible management, efficient use, and proper handling of water resources are compatible with the effectiveness and profitability of any hydraulic project.
In line with this philosophy, we offer a wide range of products tailored for this application.
We offer to the client:
– Consultancy both in the planning and in the on-site project phases including expert support.
– A sophisticated range of products designed for snow systems:
- Pipes, fittings and a set suitable for high pressure, more than 100 bar
- Special accessories needed for construction in snow systems
- Professional response and fast on-site delivery
Features of our ductile iron pipes for artificial snow production
These are the advantages of the L&P Classic joint:
- Quick and easy installation without the need for specialized personnel such as welders.
- Anti-disconnection guarantee in extreme situations such as landslides or earth movements.
- Great bending capacity up to 5º and elasticity like a chain.
Case of Success
Valdelinares ski resort
Tipology
High pressure pumping
Artificial innovation
Location
Valdelinares
Teruel, España.
The Valdelinares ski resort was undergoing expansion, with new slopes being created and a need to enlarge its artificial snowmaking network.
The project involved pumping 20 liters per second (expandable to 40 liters per second) to an existing reservoir located at 1986 meters, from a catchment point situated at 1587 meters.
The pipeline route runs for its first 3 km through an area with a steep slope, notably wooded, and with some ups and downs.